Know what to price, query and commit to.

The estimate is already under way when a revised drawing lands. You still have to decide what goes into the price, what needs clarifying and what your site team can deliver. Baudex helps you link each decision to the right project documents.

Two colleagues review documents at a table.

School refurbishment · fictional example

One project file, three decisions before you bid.

Part of the school stays open. At the tender review, the estimator, bid manager and project manager compare the project documents. An answer about the floor can change both the price and the sequence of work on site.

Which floor finishes go into the price?

The floor finishes are already in the estimate. A revised plan might bring an extra classroom into scope.

Summary of the project documents

Floor plan

Shows which classrooms are part of the refurbishment.

Finishes schedule

Specifies the floor finish in each room.

What Baudex prepares

A draft line item that links the floor finishes to the documents defining the scope.

Estimator · Check the line item

Compare the current floor plan with the finishes schedule. Record which rooms are included and which drawing revision you used. Recheck the price if the scope changes.

Explore Concept Estimating

Who removes the existing floor finish?

‘Handed over with the floor cleared’ sounds clear until someone has to price the removal.

Summary of the project documents

Invitation to tender

Calls for handover with the floor cleared.

Specification

Lists removal of the existing floor finish as part of the works.

What Baudex prepares

A draft clarification: “Should our tender include removal of the existing floor finish, or will it already have been removed at handover?”

Bid manager · Clarify the scope

Refine and submit the question before the deadline. Link the answer from the tender clarification notice to the line item so the estimator knows what to change in the price.

Explore Tender Clarifications

How will people get into the school?

Pupils and staff still need to get in when the main entrance closes. That can affect when you can work on the entrance.

Excerpts from the sample matrix · translated

Tender instructions V2 · §4.1 Access

“The school will remain accessible during the works.”

Phasing appendix V1 · phase 1

“The main entrance is temporarily closed.”

What Baudex prepares

A risk flag showing how the temporary closure could affect access.

Project manager · Check temporary access

Confirm with the school site manager and works planner which entrance can stay open during this phase. Record who checks the arrangement and what must be allowed for in the programme and price.

Explore Risk Analysis

Carry the answer into the estimate and the programme.

At the tender review, note the source, the open question and who will follow up. When the answer comes in, record the estimate item or programme activity that needs to change.

Prepare your project documents

School refurbishment requirements matrix

Source

Tender instructions V2, §4.1 and phasing appendix V1, phase 1.

Open question

Which entrance must stay available while the main entrance is closed?

Who and when?

The bid manager submits the question before the deadline. Update the row when the answer is published in the tender clarification notice.

Download the example CSV
A Weboma employee at his workstation.

Estimating at Weboma · translated

“The prep work can be quicker, as long as we can still see how an estimate item is built up.”

How to review a concept estimate

What would you like to know first?

Which documents should I start with?

Start with the documents that matter to the question, such as the specification, drawings and current programme. Record which revision applies and what information is still missing.

Who reviews the draft outputs?

Your team checks the sources and assumptions. You decide what to include in the estimate, which questions to submit and which measures to agree.

Can we focus the demo on one question from our work?

Yes. Tell us what your team is working through. We can centre the demo on an estimate item, a discrepancy in the tender documents or a project risk.

Talk through your next bid.

Bring a question from a live tender: a revised drawing, a demolition item with unclear scope or a programme that needs to keep the building in use.