Frequently asked questions

What would you like to know about Baudex?

From your first project documents to the handover to your team. Discover how Baudex works, what you can do with it and how it fits your workflow.

01

Start with your documents

Good preparation starts with the right information.

What can Baudex help our team with?

Baudex helps construction teams turn project information into a first draft they can work with: estimate items, tender clarification questions, risks and method statements. Area Measurement also helps you examine quantities on a drawing. Start with the task that needs attention and take the result into your team’s existing workflow.

Explore the platform

Which project documents do I need?

Start with the documents that define the task: the brief, specification or technical description, and relevant drawings, programme and appendices. Select the current versions, identify missing information and leave superseded documents out of your selection. For a method statement, include the award guidelines. Discuss unusual file formats beforehand.

Which file formats can I use?

For project documents, you can use PDF, Word (DOC and DOCX), PowerPoint (PPTX), and text files such as TXT, Markdown and JSON. Your cost database has a separate CSV and Excel (XLSX) import. These are different workflows: importing an Excel cost database does not mean that any spreadsheet can be analysed as a project document.

Can we start with one use case?

You do not have to change your entire workflow at once. Start with a specific task, such as preparing an estimate or comparing documents for tender clarifications. In our first conversation, we discuss the application, documents and setup that fit that task. This gives you a practical way to assess what Baudex adds to your day-to-day work.

Who reviews the draft outputs?

Your team checks the sources and assumptions. You decide what to include in the estimate, which questions to submit and which measures to agree.

Does a source reference mean the result is correct?

A reference helps you find the supporting information. You still check that the source is current, the interpretation is sound and the result applies to your task.

How do I use a Baudex draft?

You receive a first draft. You assess sources, assumptions and content. Trial use or working with your own documents is discussed separately; requesting a demo does not start an automatic trial.

Read the practical guide

Does Baudex fit our way of working?

We review your workflow, applications and desired connections together, so your team starts with a suitable setup.

Discover Baudex
02

Estimate on your own terms

From project information to items you can review.

How does Baudex create an initial estimate?

You select the project documents and define what you want to estimate. Baudex uses that information to prepare an initial set of items and quantities with the available pricing basis. You then review the project scope, descriptions, quantities and prices. The first draft gives you a concrete starting point for the rest of your estimating work.

Explore Estimating

Can we use our own cost database?

Yes. You can import your cost database (price book) from CSV or Excel (XLSX). Baudex checks the rows first, then you choose which valid rows to import. Existing prices and cost breakdowns can be updated selectively. Also check whether each price entry fits the specification and work included in your item. This keeps your own pricing basis central.

Explore Estimating

How do I check quantities and assumptions?

Start with the project scope: does the estimate cover the whole project or just one phase? Then review each item’s description, unit, quantity and available supporting information. Compare uncertain items with the specification or drawing. Baudex helps you find the rows that need attention so you can review and adjust them systematically.

What should I review before using the estimate?

Check that the scope of work is complete, quantities match the project and prices reflect how your team will deliver the work. Review units, missing items and any costs still to be added. Adjust the estimate where needed, then choose the export that fits the budget or software you will use next.

Is a draft estimate a final cost estimate?

No. Baudex prepares a draft estimate. You check scope, quantities, assumptions and pricing, and add missing information. Your team decides which costs and risks belong in the estimate. After that review, you can use the result as a basis for your further estimating work.

Explore Estimating

Which documents do I need for an initial estimate?

Start with your specification, requirements brief or technical description. Add relevant drawings and available measurement or quantity schedules. Select at least one document that is ready for use.

Explore Estimating

Your cost database, your starting point

Check first. Then bring it in.

CSV / XLSX

Your cost database

Description
Unit
Price and cost breakdown

Start with what your team knows.

Bring your existing cost database as a CSV or Excel file. Every record starts with a description and a unit.

File check
New records
Existing records
Records to review

See what happens to your records.

Baudex shows which records are new, will be updated or need attention. This check does not change your cost database.

Your cost database
Prices + cost breakdown only
All fields
Import valid records

Update the fields you choose.

For existing records, choose prices and cost breakdown only, or all fields. Then import the valid records.

03

Questions, risks and approach

Make the issues that need attention clear.

How does Baudex find differences between documents?

You select the documents to examine and can add areas of focus. Baudex compares the information and proposes questions where it finds ambiguity or differences. For example, the brief may assign floor finishes to the tenant while the technical specification assigns them to the contractor. The supporting explanation shows why the question matters.

What is a proposed question based on?

Each proposed question includes an explanation and document references. You can return to the passages that prompted it, examine what they say and discuss the implications for your bid. Your team decides which question to raise, then takes the selected questions into the clarification list.

How do I investigate a risk?

Start with the source and consider what the issue could mean for your project. Baudex brings together the description, potential impact and proposed mitigation. Discuss what your team already knows, what information is missing and who will investigate it. This turns an identified risk into a concrete topic for the project meeting.

Explore Risk Analysis

How does our own approach become part of the method statement?

Your content is the starting point. Select the project documents and add your approach, priorities and expertise. The award guidelines define the submission requirements. We agree the templates, structure and information to use during setup. In the editor, you can write directly or have a selected passage refined. You choose which suggestions to apply.

Explore Method Statements

Which documents can I use for risk analysis?

Select current project documents relevant to your question, such as a project description, programme and drawing. The documents must be ready for processing in Baudex.

Explore Risk Analysis

Can I view the source of a risk?

Yes. You can open the available source file for a risk and review its context. A page reference is included where available.

What if a risk assessment is incomplete?

Baudex then shows ‘Assessment required’ for the missing severity or likelihood. Your team can see where more information or professional judgement is needed.

Explore Risk Analysis

Can I share the risk overview with my team?

Yes. Export the analysis to Excel to bring risks, consequences, proposed measures and source references into the discussion.

Explore the risk overview

Who decides which measures we take?

Your professionals. Baudex prepares the overview and proposals; you assess the situation and agree which action is appropriate and who will take it.

From risk to mitigation

Which documents should I compare for tender clarification questions?

Start with the project brief and technical specification, then add relevant project documents. Check that you are using the correct versions and that the file is complete enough for the question you are exploring.

Does Baudex submit the questions automatically?

No. You check, edit and select the questions you want to submit. Assessment and submission remain with your team.

Can I continue with an Excel question list?

The question list can be exported to Excel. Check the content and required submission format before using it for your tender clarification round.

Explore the question list

Will I get a method statement that is ready to submit?

You receive a draft to develop further. Your team checks the content, commitments and fit with the tender requirements. You submit the final version yourselves.

Explore Method Statements

Can I have one section of the method statement revised?

You can refine a section with a targeted instruction and additional context. Check afterwards what has changed in the passage.

How do we continue working on the exported method statement?

Edit the draft with your team. Check content, source references and formatting in the document you will continue working with.

Explore Method Statements

Will Baudex help our method statement achieve a higher score?

Baudex helps with text and supporting information. The assessment depends on the requirements and the quality of the approach you actually offer.

Two passages, one focused question

The same floor. A different responsibility.

D01 · sections 2.1–2.2 · page 1
The final floor finish in the office, including skirting boards, will be supplied by the tenant…

Who supplies the flooring?

The project brief assigns the floor finish to the tenant. That passage defines a clear boundary for your estimate.

D02 · chapter 4, §4.2 · page 1
The contractor will supply and lay PVC flooring with matching skirting boards on both office floors.

Who includes it in their scope?

The technical specification names the contractor instead. Looking at the passages together makes the ambiguity clear.

Question 5
Does the final office floor finish, including skirting boards, fall within the contractor’s scope?
D01 D02

Clarify this before submitting your bid.

The reasoning and document references stay with the question. Your team decides what to ask and submit.

View the question in Baudex
Question 5 in the Dutch Baudex interface, with reasoning and references to D01 and D02.
04

Drawings and areas

Understand the measurement and its place on the drawing.

How do I set the drawing scale?

Use a known dimension on the drawing to set the scale, then check it against a second dimension. Confirm the scale for the figure before continuing. This gives the area calculation a traceable starting point. When using another drawing or revision, check again that the scale and dimensions still agree.

Explore Area Measurement

How do I check the boundary?

Follow the boundary on the drawing and check that it matches the area you intend to measure. Pay attention to openings and the limits you have chosen. The area remains visible alongside its location on the drawing, so you can review the measurement in the context of the building rather than as an isolated number.

Explore Area Measurement

How do I allocate areas to functions?

You check the gross floor area boundary and divide the measured area into zones and functions. This shows which part belongs to each use. Deliberately leave items that still need review unassigned. Check the allocation together with the boundaries on the drawing, then decide which area belongs to the relevant scope of work in the estimate.

Explore Area Measurement

What does AI do in area measurement?

In the pilot, AI can suggest a drawing frame. You choose which sheet is shared for that purpose and give permission. The gross floor area boundary is prepared separately, and you review the scale and limits yourself. This keeps the suggested frame distinct from the area you actually use for measurement.

Explore Area Measurement

Which drawing do I start with?

Start with the floor plan of the level you want to assess. Check the sheet number, revision date and a known measurement. In the demo, we look at which files suit your workflow.

Explore Area Measurement

What do I do when a new revision arrives?

Compare the new sheet with your measurement. Check changed boundaries and functions and update the affected estimate items. Record the new quantity and corresponding source sheet.

How do I use the m² in my estimate?

Use checked quantities as the basis for the relevant item. Also record price, source, reference date and scope. A floor's gross floor area is not automatically the quantity of floor finish.

From drawing to quantity

A measurement you can locate on the drawing

See what the area includes.

Dutch Baudex product view showing a selected shared zone of 148.4 m² and a magnified boundary detail.
Shared area 148.4 m²

Shared area: 148.4 m².

The selected zone and its area are visible together. You can see exactly where the result belongs in the project.

Dutch Baudex product view showing a selected shared zone of 148.4 m² and a magnified boundary detail.
Boundary detail 148.4 m²

Follow the boundary on the drawing.

Inspect the corner points and the connection along the hallway. Check the boundary before using the area in your next step.

05

Continue in your systems

Take your work into the next step.

Does Baudex replace our estimating software?

You can use Baudex for preparation and continue in your existing estimating software. Baudex helps you develop and review project information; the handover follows the next step your team chooses. We discuss which data needs to transfer, the required format and the setup needed to make that work.

How do I transfer an estimate to IBIS?

Baudex exports reviewed estimates as CUF-XML 4.003 for exchange with IBIS. You can also download specifications and a budget report. We align the handover with your IBIS edition and setup. This is file exchange, not automatic synchronisation. After import, check that items, quantities, units and prices have transferred correctly.

Which results can I export?

The options depend on the application. An estimate can be exported as CUF-XML or as specifications and a budget report. Excel output is available for tender clarification questions and risks. Choose the output your colleague or receiving system needs, so the result remains useful for review, discussion or further development.

What does connecting our systems involve?

We start with the data flow: what needs to move between systems, in which direction and for which task? The receiving software helps determine the format and structure. We then agree fields, version control and permissions. Sign-in also involves roles and revoking access. Available integrations are configured for your environment, with the work and cost agreed beforehand.

Will an export work directly in our other software?

That depends on the format, software version and configuration. For IBIS, we discuss the CUF/XML route and check the transferred data. Agree in advance on the structure and checks your system needs.

What needs to be transferred?

A line item, source reference or document version? Choose the information the next colleague needs. Also agree which system remains the source of truth.

When is the transfer correct?

After import, compare descriptions, quantities and units with the original estimate.

06

Data and getting started

Clear agreements and a practical start.

What happens to our project data?

Your documents remain yours. Baudex processes the selected information to produce the work you request. Access, the processing route, security, retention and what happens when use ends are covered by your environment’s agreements. External providers may be involved in AI processing. Our security information, privacy notice and agreement describe the principles and responsibilities.

How we handle your data

Are our documents used to train AI models?

Active Collective does not use customer content to train general-purpose models for other customers unless you explicitly agree to this in writing beforehand. Agreements and settings with external AI providers form part of your environment’s processing arrangements. We discuss that processing route and its terms before your team starts using it.

Read our privacy policy

What determines the setup and cost?

The applications, team size, required setup and any integrations determine what is involved. We first discuss your task and the systems you already use. We then explain what the setup includes and what it will cost. You do not need a detailed technical plan before starting that conversation.

Discuss your setup

What will we cover in a demo?

We start with a familiar task, such as an item’s quantity and pricing basis, a discrepancy in the tender documents or a project risk. We show what Baudex prepares, how you examine the supporting information and what your team needs next. You can ask about your systems and setup. Use of your own documents or a trial is agreed separately.

Can we use existing company accounts?

Microsoft Entra ID and Google Workspace SSO are listed as integration routes to discuss. Feasibility and configuration of sign-in, roles and user management are assessed for your organisation.

Where are our specific arrangements recorded?

In your agreement and related documents, such as the data processing agreement and service arrangements. The public privacy notice describes the general principles.

Understand more. Take the next step.

From well-prepared project documents to an estimate you can review. Explore practical ways to apply it in your work.

Explore our resources

Contact

Still have a question?

Tell us what you are working on and where you need a hand. Guido or Kim will help you explore the next step.

Choose language

Dutch is selected.