Risk analysis

See what could affect
your project.

Baudex brings together risks from your project documents, with possible consequences, proposed measures and source references. You assess what needs attention before bidding or starting work.

Planning.pdf, page 2

The ventilation component is needed before week 4. The delivery date is not yet confirmed.

Delivery date

Still open

Needed before

4

week 4

From separate documents
to a clear view of risks.

Explore the source, possible consequence and proposed measure for each issue.

Your project documents

Project description

PDF

Programme

PDF

Floor plan

PDF

Risk overview

Workshop renovation

1

Construction

Agree working windows

2

Programme

Delivery date still unconfirmed

3

Safety

Temporary passage still to be defined

Programme

Needed before week 4.
Delivery date still unconfirmed.

In this fictitious renovation project, part of the workshop stays in use. One unconfirmed delivery calls for a concrete agreement.

Planning.pdf

Page 2

“The new ventilation component must be delivered before week 4. The final delivery date has not yet been confirmed.”

Ventilation component

Schematic illustration of a ventilation component

Needed before

week 4

Delivery date

Still unconfirmed

Programme depends
on delivery

Issue for the programme

Your programme relies on an unconfirmed delivery.

The work in week 4 may be delayed.

Severity

Medium

Likelihood

Medium

Proposed
measure

Request delivery confirmation and discuss an alternative with the supplier.

What do the documents say?

Planning.pdf

Page 2

Workshop renovation

The new ventilation component must be delivered before week 4. The final delivery date has not yet been confirmed.

This passage specifies when the component is needed. A confirmed delivery date is missing. That gap is the starting point for your assessment.

For your project review.

Which confirmation is missing?

Ask the supplier when the component can actually be delivered.

What alternative is possible?

Discuss what you can do if delivery before week 4 is not feasible.

What does this mean for the programme?

Compare the answer with the planned work and decide the next step together.

These questions help prepare the discussion. Assessment and agreements remain with your team.

Your judgement

Which confirmation do we need to assess the programme?

One workshop.
Three decisions.

Explore what day-to-day use means for construction. Choose an issue.

Workshop during renovation

Schematic workshop showing the work zone, daily use and a passage still to be defined Schematic workshop showing the work zone, daily use and a passage still to be defined Schematic workshop showing the work zone, daily use and a passage still to be defined

Align working windows with daily use.Assess clear passage during the works.Agree who decides on the closure, and when.

Construction

Working hours still to be agreed.

Possible consequenceThe works may conflict with day-to-day use.

Severity

High

Likelihood

Medium

Proposed measureAgree working windows and access with the user in advance.

Projectbeschrijving.pdf, page 3

The workshop remains partly in use during renovation. Working hours and closures are agreed before work starts.

Discuss with your team

Which working windows and access arrangements are needed before work starts?

Safety

Clear passage not yet defined.

Possible consequenceAccess during construction needs a technical assessment.

Severity and likelihood

Assessment required

Proposed measureHave the responsible professional assess the temporary arrangement.

Plattegrond.pdf, page 1

The work zone is marked. The clear passage width during the works has not yet been defined.

Discuss with your team

What does the professional need to know to assess the temporary passage?

Coordination

Decision point missing.

Possible consequenceThe team cannot yet finalise the sequence of work.

Severity

Low

Likelihood

Medium

Proposed measureRecord who coordinates the closure and when the decision is needed.

Projectbeschrijving.pdf, page 3

The workshop remains partly in use during renovation. Working hours and closures are agreed before work starts.

Inference for assessment
The decision point for the temporary closure is missing.

Discuss with your team

Who coordinates the closure and when is the decision needed?

From an actual risk analysis

From source to a concrete measure.

Aan de Singel, De Lier. Three issues from the same result.

05

Lift shaft ventilation

Two supplies, two extracts

04

Smoke passage

Assess Ra / R200 further

08

Roof access

Roof hatch with scissor ladder

In the source

Lift shaft ventilation on the original source sheet

2× supply / 2× extract for lift shaft

5   Quality

Lift shaft ventilation may be incorrectly balanced or insufficient.

Severity

Medium

Likelihood

Medium

Possible impact

Comfort complaints, faults and additional balancing and remedial work.

Proposed measure

Verify in the PDF; prepare a balancing plan and perform a functional test of the lift shaft ventilation.

Good to know

Before you
open your project file.

Which documents can I have analysed?

Select current project documents relevant to your question, such as a project description, programme and drawing. The documents must be ready for processing in Baudex.

Can I view the source of a risk?

Yes. You can open the available source file for a risk and review its context. A page reference is included where available.

What if an assessment is missing?

Baudex then shows ‘Assessment required’ for the missing severity or likelihood. Your team can see where more information or professional judgement is needed.

Can I share the risk overview with my team?

Yes. Export the analysis to Excel to bring risks, consequences, proposed measures and source references into the discussion.

Who decides which measures we take?

Your professionals. Baudex prepares the overview and proposals; you assess the situation and agree which action is appropriate and who will take it.

Your project, your judgement

What would you like to clarify
before work starts?

Discuss your specific task with Guido or Kim. Together, you explore how Risk Analysis fits your project review.

Request a demo

The source for risk 5

Lift shaft ventilation on the original source sheet

22-126 BA ventilatie algemene ruimten Aan de Singel Fase 2B - De Lier.pdf

Open the source sheet

Ten risks from Baudex

Demo result dated 24 February 2026. The interface was captured on 11 November 2026.

The original results table with ten risks in Baudex

No.

Category

Risk

Impact

Severity

Likelihood

Measure

1

Safety

Incorrect smoke or fire classification for pipes/insulation in additionally protected escape routes.

Failed fire safety approval, unsafe escape route, remedial work and delay.

High

Medium

Verify in the PDF; approve materials and ensure the required smoke classes s1/s2.

2

Legal

Fire resistance of the primary structure depends on the structural engineer; risk of missing or late information.

Design changes, delays in permitting/review and possible additional costs.

Medium

Medium

Verify in the PDF; ask the structural engineer to confirm fire resistance in writing in good time.

3

Safety

The roof finish may not meet the ‘non-fire-hazardous’ requirement under NEN 6063.

Increased fire risk, failed inspection, roof build-up changes and delay.

High

Low

Verify in the PDF; select a roof build-up with documented NEN 6063 classification.

4

Legal

Ra/R200 smoke passage requirements depend on an external fire safety report; risk of inconsistencies.

Failed fire safety approval, detail changes and delayed handover.

High

Medium

Verify in the PDF; obtain the fire safety report and check details against Ra/R200.

5

Quality

Lift shaft ventilation (2x supply/2x extract) may be incorrectly balanced or insufficient.

Comfort complaints, faults and additional balancing and remedial work.

Medium

Medium

Verify in the PDF; prepare a balancing plan and perform a functional test of the lift shaft ventilation.

6

Quality

Natural ventilation in the bicycle/mobility scooter storage area may not ensure adequate air quality.

Odour and moisture problems, complaints and possible mould growth.

Medium

Medium

Verify in the PDF; check capacity and add mechanical assistance if needed.

7

Quality

Insufficient specification of the transfer grille/heat recovery unit position increases the risk of incorrect installation.

Rework, comfort issues and delay due to differing interpretations.

Medium

High

Verify in the PDF; specify flow rates/grille data and record construction drawings.

8

Safety

Roof access through a hatch with a scissor ladder creates a fall risk during maintenance and inspections.

Injury, work stoppage and investigation by the regulator.

High

Medium

Verify in the PDF; organise fall protection, instruction and a safe roof access procedure.

9

Programme

Items marked ‘to be developed’ increase the likelihood of scope changes and delays.

Late decisions, disputes over additional work and shifted milestones.

Medium

Medium

Verify in the PDF; create an open-points list and finalise design decisions before procurement.

10

Sustainability

Insufficient assurance of BENG requirements may lead to deviations in energy performance and handover checks.

Recalculations, changes to services/building envelope and risk of delayed handover.

Medium

Medium

Verify in the PDF; check building services against BENG and document the evidence (calculations).

Document for these ten risks

22-126 BA ventilatie algemene ruimten Aan de Singel Fase 2B - De Lier.pdf