How to prepare project documents

You do not need the entire project archive. Choose one task, collect the current documents and note what is missing. Your team can then review the first result.

In this article

Choose what to investigate

“Prepare an estimate” is broad. “Prepare the phase 1 screed item” identifies which elements and documents matter. Choose a task the reviewer knows from experience.

Record the required output, building element or phase and what remains out of scope. This short definition guides your choice of sources.

Make the current version clear

For the screed item, start with the current specification, relevant floor plans and changes from revisions or tender answers. Add appendices only where they help explain the work, quantity or pricing basis.

Make a short document list: file name, revision or date, purpose and anything missing. Keep superseded versions separate unless you are examining the change itself.

A small source set for the screed item

Specification / technical description

Current version
Record revision and date
Purpose
Establish specification and scope
Open question
Are the referenced appendices present?

Phase 1 floor plans

Current version
Select the current revision
Purpose
Check areas and apartment types
Open question
Are dimensions and openings readable?

Tender clarifications

Current version
Add applicable answers
Purpose
Apply changes to the scope
Open question
Has responsibility for the floor finish been clarified?

Your price book

Current version
Record the version used
Purpose
Review unit and cost breakdown
Open question
Which work is included in the price?

Check that the documents are readable

Open a text page and a dimensioned drawing. Are the legend, units, dimension lines and page numbers readable? Check that referenced detail drawings are present.

Replace unreadable scans where possible and list missing parts. Agree on unusual formats or large files in advance; do not assume every model or document format is supported.

Add your working context

The same screed needs a different assessment if only phase 1 is in scope or substrate preparation is a separate item. Include those project arrangements. An estimate also needs its pricing basis; a plan needs the team’s working agreements.

Distinguish documented facts, working agreements and assumptions. For each assumption, record what information would confirm it.

Agree the handover and review

Are the task, document list, missing information and reviewer clear? You have a useful starting package. Agree which output you will examine together and what you need to be able to explain.

Agree on secure delivery of your own documents beforehand. Use the public demo form for the task description; do not include a confidential project file or sign-in details.

Prepare the first task together

Use the practical guide worksheets to choose a task, record the source documents and agree who reviews the result.

Request the practical guide