Start with the requirements, not the writing
In the floor-finish example, two documents assign the same work differently. First check the space, work and revision each passage covers. The discrepancy becomes useful when you can locate it precisely.
Compare the two source locations. Then check whether a later amendment has clarified responsibility. This avoids asking something the documents already answer.
Turn uncertainty into focused questions
Baudex can prepare a substantiated draft query from the source passages. The tender team reviews it and chooses what to submit.
Link the received answer to both source passages and record the basis that now applies. Do not supply a missing answer yourself or treat it as an agreed scope decision.
Who supplies the floor finish?
D01 Projectuitvraag
The project brief assigns the office floor finish and skirtings to the tenant.
D02 Technische omschrijving
The technical description assigns the PVC floor finish and skirtings on both office levels to the contractor.
Is the final office floor finish, including skirtings, within the contractor’s scope or not?
Connect uncertainty to the project
While responsibility is unresolved, the interface between screed and floor finish is uncertain too. Which activities and costs could be affected? What does the estimator need to continue?
State the possible impact and who investigates it. Distinguish an unconfirmed assumption from an established risk; the consequences depend on the actual scope and execution.
Explore Risk AnalysisMake your approach concrete
Once responsibility is clear, define the handover as well. Who checks the substrate, who coordinates with whom and before which work must this be agreed? That makes a plan passage assessable.
Use Baudex for a draft structure and focused wording. Add your own team’s roles and agreements. Do not adopt a general promise that delivery teams or partners cannot fulfil.
Check consistency before submission
Before submission, check that the answer is reflected consistently in scope, estimate, programme and method statement. Updated text alongside an unchanged price leaves the same problem unresolved.
The tender team maintains this alignment. The applications prepare separate outputs; do not assume that a tender answer automatically updates every other part.
From general wording to a practical commitment
Explore how the requirements and your working approach come together in a method statement.
Explore Method Statement