For project managers

Know what’s still open before handover.

Baudex brings a potential risk, its source and a proposed measure together. You and your team decide what needs checking.

Explore the project documents

Ventilation drawing

Project example

Phase 2B
To be verified

Lift shaft ventilation

Is the ventilation adequate and correctly balanced?

From drawing
to site meeting.

Follow one issue from a project file. See what the drawing supports and take a specific question to your meeting.

Drawing
Ventilation drawing · Phase 2B
Two extract points above and two supply points below, as shown on the lift shaft ventilation drawing.

What does the drawing show?

Two supply points. Two extract points.

The drawing shows where the four points are. The building services consultant checks the current documents to establish whether the ventilation is adequate and being balanced correctly.

Open the source extract (PDF)
Finding

Risk 5 · Quality

To be verified

The lift shaft ventilation may be inadequate or incorrectly balanced.

Possible impact
Comfort complaints, faults and additional balancing or remedial work.

What does Baudex suggest?

Check the situation against the source document, prepare a balancing plan and carry out a functional test. The building services consultant assesses which checks are needed.

Explore risk analysis
Meeting item

Question for the site meeting

What functional test do we need before handover?

The CSV includes this example and a blank row for your own project.

Download the meeting item (CSV)
Action
Check the current drawing and the balancing plan. Agree what functional test is still needed.
Who is responsible
Building services consultant. Record who schedules the test and who reviews the result.
Deadline
Set a date to review the test result before handover.

Bring one open issue to your demo.

We’ll look at the source and the question you want to discuss with your team.