Two heights. One design decision.

The tender requirements say 4.50 m. The technical specification says 4.20 m. Meanwhile, structural and building services teams are still working on the drawings. Baudex helps you compare the passages so you can raise the discrepancy before it makes its way into the design.

Two colleagues review construction drawings pinned to a wall.

Example · Commercial building

What clear height should you record?

Both documents describe the same overhead door. The widths agree. Before taking either height forward, establish which value applies and where it is measured.

Overhead door

Clear opening

Decision pending

Compare section 3.2 in both documents

Tender requirements

4.50 m

Clear height

Technical specification

4.20 m

Clear height

Summary of the example passages. Both documents specify a clear width of 4.00 m.

Thirty centimetres can affect more than the door.

The height could affect the lintel position, the room for the door tracks and the route of a service pipe. Raise the discrepancy before the model is detailed or the door is priced.

Keep a record of both sources

Record the document title, section 3.2 and current revision for each passage. Check whether a later addendum already resolves the discrepancy.

Review the section drawing

Lowest obstruction with door open

Clear height

Finished floor level

Schematic section without dimensions. Include door tracks and services above the opening in the check.

Measure the clearance people can actually use.

Ask the design team to mark the starting level and the lowest obstruction on the section. Use those reference points to compare the two heights.

Keep the dimension open

Flag it in the model and the assumptions register. Agree which work is waiting for confirmation.

Draft question for the client

Which clear height applies to this overhead door: 4.50 m in the tender requirements or 4.20 m in the technical specification? Between which floor level and point above the opening should the design team measure it?

Submit both passages with the marked-up section drawing.

Make the answer usable in the next revision.

Record the confirmed height, the measurement points and the decision reference. Ask the relevant teams which drawing, assumption or cost item needs to change.

Assign an owner

The design coordinator tracks the agreed change and records who has received the revised information.

Hand over the decision with the drawing.

Use one row per requirement. Add the source revisions, the open question, its owner and the decision deadline. Once agreed, put the confirmed value and decision reference on the same row.

Prepare your project documents

Design assumptions register · Clear height

Requirement

Clear height of overhead door

Sources

Tender requirements § 3.2 (4.50 m) and technical specification § 3.2 (4.20 m). Add the revisions.

Owner

Design coordinator raises the issue with the client.

Decision due

Before the section drawing is issued. Review the door specification and estimate too.

Download the assumptions register (CSV)

Example draft question

Which clear height applies to this overhead door: 4.50 m in the tender requirements or 4.20 m in the technical specification? Between which floor level and point above the opening should the design team measure it?

Project brief · § 3.2 · 4.50 m

Technical specification · § 3.2 · 4.20 m

Turn two source passages into one focused question.

Compare the two passages. Check that the draft question covers both the difference in clearance and the measurement points, so the answer can inform the next revision.

Explore Tender Clarifications

What should you record before progressing the design?

Which documents do you compare?

Start with the current tender requirements, technical specification and the section showing the door. Include any recent addenda.

What if the team needs to keep working?

Agree which work can proceed while the dimension is open. Give any temporary design assumption an owner and a decision deadline.

Can Baudex determine which dimension applies?

Baudex helps locate the passages and the discrepancy. The client or designated decision-maker confirms the requirement. The design team checks that it works in the section.

Which assumption is holding up your design?

Bring the two relevant passages and the drawing. We can look at how to record the discrepancy with its sources and get it in front of the person who can resolve it.

Request a demo